Quality Molding I, Seminar realization: EN, customer / Q1 Quality Molding I (VE)

Injection molding can be improved sustainably with in-cavity pressure sensors and process monitoring from Kistler.
Q1 Quality Molding I (VE)
44002799
Upon request
On request
Log in to myKistler to see prices
Training details
Duration [days]
2
Location
On-site
Language
English
Trainings by application
Cavity pressure injection molding

The training is part of the Kistler Knowledge Training module. This concept is based on conveying fundamental correlations and in-depth process knowledge.

The training is the first part of a modular learning cycle. It is completed with a recognized certificate, which is based on a final exam after each module.

Seminar content:

Module 1 (Day1):

  • Process data vs. setup data
  • Cavity pressure in the process phases
  • Different materials
  • Correlation to setup data
  • Correlation to product quality data
  • Failure modes and corrective actions


Module 2 (Day2):

  • Mold start-up with the support of cavity pressure
  • Setup of a new process (injection, transfer, holding pressure)
  • Demonstrate / Use ComoNeo Recover
  • Monitoring of the injection molding process
  • Control options based on cavity pressure
  • Exam


Goal:

  • Comprehensive understanding of the cavity pressure curve
  • Understanding of how process-related relationships in the mold are reflected in the cavity pressure curve
  • Interpretation of the cause of a change
  • Application of the learned correlations on the injection molding machine
Loading