Quality Molding II, Seminar realization: EN, customer / Q2 Quality Molding II (VE)

Injection molding can be improved sustainably with in-cavity pressure sensors and process monitoring from Kistler.
Q2 Quality Molding II (VE)
44002803
Upon request
On request
Log in to myKistler to see prices
Training details
Duration [days]
3
Location
On-site
Language
English
Trainings by application
Cavity pressure injection molding

The training is part of the Kistler Knowledge Training module. This concept is based on conveying fundamental correlations and in-depth process knowledge.

This training is a supplement and intensification to the seminar Quality Molding 1. It is completed with a recognized certificate, which is based on a final exam after each module.

Seminar content:

Theory:

  • Material behavior during injection molding
  • Physical processes in the process phases
  • Switching strategies
  • Aids for process setup
  • Mold-specific features (hot runner)
  • Hot Runner Balancing with Multiflow
  • Development of checklists


Practical workshop:

  • Systematic setup of the injection molding process based on self-determined checklist
  • Clear separation of process phases
  • Processing of different materials
  • Practice on different molds (hot runner vs. conventional gate)
  • Interpretation of processing errors intentionally created
  • Correction of errors
  • Demonstrate / Use ComoNeo Multiflow
  • Exam


Goal:

  • In depth understanding of the physics influencing the injection molding process
  • Understanding of the individual process phases
  • Systematic setup of the injection molding process based on physical principles (scientific molding)
  • Understanding of material behavior and the molding process
  • Recognition of process errors and corrective measures
  • Possibilities of visualizing processes in the mold
Loading
Loading